Wednesday, September 26, 2007

Hacking work is finished

When I arrive our flat, the main gate is open. I find it is the designer who is on site to wait for me.
Sand is full of half of the living room and tiles are in common room. Every un-need thing has been hacked away. The floors and walls are made up by cement. Electrical wire on kitchen and toilet wall is removed and hung here and there. Toilet bowls and basins are demolished. Em, above is the list of what reno work has been down till now.
The designer shows me the tiles, especially the changed tile for kitchen wall. The difference between the tiles of kitchen wall and toilet wall is: the tile for toilet wall has some decorative design in yellow but the tile for kitchen wall looks all white.
The designer asks whether we want to change the wooden window frame of toilet, since wood is easy to go rotten. Need decide it after discuss with Sigma. For my opinion, I feel it is ok now and will be ok for recent following years. So no need spend money on it. What need do is just to paint the frame and clean the window glass. Any way, leave it to Sigma to decide.
We decide to move the basin from kitchen into the narrow common toilet and put the toilet bowl, basin and instant heater in a line. Our wash machine and refrigerator will be put side by side at the place where the basin is. So that the corner between refrigerator and the store room wall will be our small dining area. It is big enough for 2 to 5 persons. Our 10 feet kitchen cabinet will be a straight line shape, sink and hob side by side. The huge pipe beside kitchen cabinet will be covered.
We need buy some new lights. The designer does us a favor, he will change the lights for free. Nice guy! Maybe I will ask him go with us to select the lights so that he could give us some professional advice. Haha : )

No comments: